Water Treatment Plant Chemical
Request for Proposals RIVERSIDE WTP RAW WATER PUMP NO. 5 CITY OF GAINESVILLE, GEORGIA The City of Gainesville is requesting proposals for the Riverside WTP Raw Water Pump No. 5. The Project will consist of a new 1,000-hp vertical turbine pump, equipped with a VFD. New pump discharge piping and valving which shall include a swing check valve, combination air-vacuum release valve, and butterfly valve. New electrical line-up in the raw water pump station electrical building for the new pump. New supplemental HVAC and roofing upgrades for the raw water pump station and the raw water pump station electrical building. Integration of the new pump and VFD into the existing SCADA system and replacement of the site-wide fiber optic network with single mode fiber optic cable and components. Beginning on Monday, April 6, 2026, Contract Documents can be obtained from QuestCDN (Project #10097279). Visit the Quest CDN webpage (www.questcdn.com). Prior to downloading the Proposal Documents, Proposers will be required to set up a QuestCDN.com account. A mandatory Pre-Proposal Conference will be held on Thursday April 9, 2026, at 2:00 p.m., local time at the Riverside WTP at 2120 Riverside Drive Northeast, Gainesville, Georgia 30501. Proposals will be received at the Department of Water Resources Engineering and Construction Services Division, 757 Queen City Parkway, Gainesville, GA 30501, 1st Floor until 2:00 p.m., local time, Thursday, April 30, 2026. 157794 3/11, 18, 25, 4/1